Skip to content

Delivery Status

Projects under preparation

Initiatives progressing through feasibility, engineering, approvals and commercial structuring.

What this stage is

Preparation is where a concept becomes a proposition an institution can assess. It is the longest stage on the ladder — four rungs, covering full feasibility, engineering and statutory approvals, the commercial structure, and the search for capital. It is also the stage most development programmes underfund, and the reason a pipeline stalls is far more often that preparation was never completed than that money was never available. A project that leaves this stage carries a feasibility study, an environmental and social screening, a preliminary design, a live approvals register, a settled risk allocation and a financing plan.

No initiative has reached this stage. Status follows readiness, and readiness advances only when the evidence for the next step exists. An empty list here is an accurate statement of where the portfolio stands, not an omission — and it will stay empty until a record holds the evidence named below.

Readiness Ladder

This stage covers 4 rungs, NBP-4 to NBP-7

Every record in the registry sits on the NBP-0 to NBP-10 ladder. A project moves up a rung when it produces the evidence that rung requires — never because a date has passed or a decision has been announced.

NBP-4 · Feasibility

Rung 5 of 11

Full feasibility confirms the technical, financial and environmental case.

Evidence required: A completed feasibility study and environmental and social screening.

NBP-5 · Engineering & Approvals

Rung 6 of 11

Design is advanced and statutory approvals are being obtained.

Evidence required: Preliminary engineering design and a live approvals register.

NBP-6 · Commercial Structuring

Rung 7 of 11

Delivery model, ownership and risk allocation are being settled.

Evidence required: A commercial structure paper and draft risk allocation matrix.

NBP-7 · Financing

Rung 8 of 11

The project is being matched with suitable public, private or development capital.

Evidence required: A financing plan and a documented investor engagement record.

A project arrives here from Under Study, and only once it holds the evidence NBP-4 requires. It leaves for Investment Ready when it holds what NBP-7 requires: a financing plan and a documented investor engagement record.

Where the portfolio stands

The whole ladder, counted

Published so that an empty stage can be read against the stages that are not empty, rather than in isolation.

Under Study

20

20 recorded.

Under Preparation

0

This page.

Investment Ready

0

None yet.

Under Construction

0

None yet.

Operational

0

None yet.