Skip to content

Project Portfolio

Projects that connect vision with delivery

Follow the ongoing Cameroon city project and explore the initiatives being prepared across NBP’s development sectors.

Initiative Pipeline

Understand each stage of preparation and delivery

These counts cover the classified initiative registry. A stage advances when the required evidence is available.

How readiness is assessed

Development Initiatives

Explore the programmes under preparation

Every initiative carries its current readiness and data-confidence level.

View the full pipeline
Continental Digital Government Backbone — concept visualization
NBP-2Concept Visualization
Multi-country, Africa

Technology & Digital · Digital infrastructure program

Continental Digital Government Backbone

A shared digital backbone enabling secure data exchange between authorised government systems, so public services can be delivered through consistent, verifiable channels.

Strategic objective

Reduce the administrative cost of public service delivery and improve service reliability by connecting systems that currently operate in isolation.

Under StudyConcept

NBP-TEC-NDGB|Capital requirement under study

Coastal Gateway City Transformation Program — concept visualization
NBP-2Concept Visualization
Atlantic seaboard, Africa

Urban Development · Integrated urban program

Coastal Gateway City Transformation Program

An integrated urban program template for Africa’s coastal gateway cities — the port metropolises that carry the bulk of a country’s trade — addressing mobility, drainage, waste, water, lighting and digital services as one coordinated system.

Strategic objective

Improve the productivity and liveability of the principal economic centre of a coastal African economy by treating urban systems as interdependent rather than as separate procurements.

Under StudyConcept

NBP-URB-CGCT|Capital requirement under study

Capital City Transformation Program — concept visualization
NBP-1Concept Visualization
Capital regions, Africa

Urban Development · Integrated urban program

Capital City Transformation Program

An urban program template for African capitals, addressing mobility, public space, water and administrative service delivery in topographically constrained administrative cities.

Strategic objective

Improve access to administrative services and reduce journey times in a capital, while managing the drainage consequences of hillside and valley geography.

Under StudyConcept

NBP-URB-CCT|Capital requirement under study

Deep-Water Port, Industrial & Logistics Development Program — concept visualization
NBP-2Concept Visualization
Gulf of Guinea, Africa

Infrastructure · Industrial and logistics program

Deep-Water Port, Industrial & Logistics Development Program

A port-linked industrial and logistics development opportunity at Africa’s deep-water gateways, examining how deep-water access can support processing, warehousing and regional trade.

Strategic objective

Convert deep-water port access into local industrial and logistics activity, so that more value is retained onshore rather than exported in raw form.

Under StudyConcept

NBP-INF-DWPIL|Capital requirement under study

Continental Clean Energy & Grid Modernization Program — concept visualization
NBP-2Concept Visualization
Multi-country, Africa

Energy · Energy systems program

Continental Clean Energy & Grid Modernization Program

A program to strengthen electricity reliability through diversified generation, transmission reinforcement and distribution modernization.

Strategic objective

Improve the reliability and affordability of electricity supply so that households, health facilities, industry and digital infrastructure can operate without interruption.

Under StudyConcept

NBP-ENE-CEGM|Capital requirement under study

National Solar & Energy Storage Program — concept visualization
NBP-1Concept Visualization
Multi-country, Africa

Energy · Generation program

National Solar & Energy Storage Program

A program assessing utility-scale and distributed solar generation paired with storage, to add dispatchable capacity where the grid can accept it.

Strategic objective

Add generation capacity that can be deployed quickly and sited close to demand, reducing transmission losses and improving supply during peak periods.

Under StudyConcept

NBP-ENE-NSES|Capital requirement under study