Skip to content

Impact

How outcomes are measured and reported

Thirteen metrics, each with a baseline, a target, a current value and a named verification source. A metric without a verification source is not reported.

No outcomes yet

No initiative has been delivered, so there is nothing yet to report against these metrics. Baselines are established during feasibility, before a programme commits to a target — measuring change requires knowing the starting point, and a target set without one cannot be assessed afterward.

The measurement framework

Each metric records four things: where it started, what the programme targets, where it stands now and who verifies it.

MetricWhat is measuredBaselineTargetCurrentVerification source
EmploymentJobs created and sustained, by type and durationNot yet setNot yet setContractor and operator payroll reporting
SMEsDomestic suppliers engaged and value contractedNot yet setNot yet setProcurement records
EnergyCapacity added, availability and losses reducedNot yet setNot yet setUtility operating data
TransportJourney time and freight cost on served corridorsNot yet setNot yet setCorridor survey
WaterHouseholds served and distribution losses reducedNot yet setNot yet setUtility metering
HealthFacilities modernised and services available regionallyNot yet setNot yet setHealth authority records
EducationTraining places and certification completionsNot yet setNot yet setCertification bodies
HousingServiced plots and homes deliveredNot yet setNot yet setMunicipal records
AgriculturePost-harvest loss reduction and processed volumeNot yet setNot yet setProducer and processor reporting
IndustryOperating capacity and output value added domesticallyNot yet setNot yet setIndustrial reporting
Digital connectivityCoverage, redundancy and service availabilityNot yet setNot yet setNetwork operator data
EnvironmentEmissions intensity, land restored and material recoveredNot yet setNot yet setEnvironmental monitoring
Local contentShare of programme value delivered by domestic suppliersNot yet setNot yet setContract records

Baseline and target columns read “not yet set” rather than showing an illustrative figure. An invented baseline makes every subsequent impact claim unverifiable, which is the opposite of what an impact framework is for.